Added to comparisons. Check added properties.

Offices in Spark C – office space in Wola, close to Okopowa Street, in the area of ​​Wolska and Solidarności

Offices for rent in the area of ​​Okopowa and Wolska streets in Warsaw

Spark is an office complex built in the dynamically developing Wola district. Construction of the first phase of office building C began in 2016 and will end in February 2018. The planned completion date of the remaining two phases of the complex is expected in 2021. The investment was designed to meet the needs of all users: tenants, locals and people with disabilities. In order to better match the project to the adjacent urban tissue, invited to cooperate foundations: “Na Miejscu” oraz “Project for Public Spaces”, which specialize in planning urban-friendly spaces. The project will provide high quality public space and 70000 sq m of modern space.

  • A new A + class building

  • The greenery of the green building

  • Certificate – an object without barriers – adapted to the needs of disabled people

  • Visual identification using the Braille alphabet

  • Number of above-ground storeys: 9 Number of underground stories: 2 Air-conditioned office spaces

  • Smoke detectors

  • LED lighting

  • Raised floors

  • Electrical, computer, telephone, fibre optic cabling

  • Wall partitioning

  • The canteen where you can buy honey from the apiary located on the roof of the building

  • Restaurant and cafes

  • Reception

  • Access control to the building

  • Parking for cars with 86 parking spaces

  • Bicycle repair stations, locker rooms and showers for cyclists, bicycle lifts and bicycle stands

  • ATM, Paczkomat

  • Pralniomat

  • The Spark complex will offer a total of approximately 70,000 sq m. office space in three buildings. Spark C building with 9 floors, Spark B building with 10 floors and Spark A skyscraper with 30 floors and 130 m high.

Location

The Spark C office building is located in the left-bank Warsaw, in the Wola district; The Spark C office building is the furthest located building, from the entire Spark complex, from the intersection of Okopowa Street and Solidarności Avenue – at the “roundabout” Kercelak; The complex is located in the area of Wolska street, close to ul. Chłodna, on the so-called “Serek Wolski”; Very good location for employees; Next to the building there are bus stops 102, 190, 520, 527, E-2, and tram lines 1, 9, 10, 11, 13, 20, 22, 23, 24, 26, 27, 28, 31. The location provides quick communication with the centre of Warsaw and excellent access in the Wola district Good access to the neighbouring districts to Bemowo, Żoliborz, Ochota and further to Bielany, Mokotów or Praga; The new office building is located in the developing part of the Wola district office; Nearby there are local grocery stores, Żabra, Tesco Express, Lidl, Decathlon; about 8 minutes to Central Railway Station Warszawa Centralna; about 20 minutes by car, and about 35 minutes by public transport to the airport Fryderyk Chopin in Okecie, Warsaw; The metro station Metro Rądo Daszyńskiego has located 2 tram stops from the Spark complex, Trams allow quick access to the metro, runs every 2 -5 minutes; 1.3 km from the office building there is a Klif shopping centre (2 tram stops); about 8 minutes access to the Złote Tarasy shopping centre, located opposite the Pałac Kultury i Nauki; In the immediate vicinity are, among others hotels Ibis Warszawa Centrum and Hilton Warsaw Hotel; In the neighbourhood there are banks, ATMs, a pharmacy, restaurants and a gym;

Technical data

  • Number of buildings
    3
  • Building class
    A
  • Number of underground levels
  • Number of ground floors
    9
  • Space of ​​a typical floor (sq m)
    1407
  • High (m)
  • Reception
    YES
  • BMS
    YES
  • Heat sensors
    NO
  • Smoke detectors
    YES
  • Air conditioning
    YES
  • Open windows
    NO
  • Raised floor
    YES
  • Controlled access
    YES
  • Security service
    YES
  • Monitoring
    NO
  • Two independent power sources
    YES
  • Certificates
    NO
  • Close to the metro station
    YES
  • Offer ID
    bk10266

Distances

Dworzec Centralny
Hotel (****)
Stacja metra Rondo Daszyńskiego
Przystanek autobusowy/tramwajowy
Lotnisko Chopina

Market data

W 3 kwartale 2023 roku w Warszawie do użytku został oddany jeden nowy projekt biurowy. Był to S-Bridge Office Park A2, który zasilił wschodnią strefę biurową Warszawy.

Na koniec 3 kwartału w budowie na rynku warszawskim pozostawało ponad 240 tys. m2 nowoczesnej powierzchni biurowej. Największą aktywność deweloperów obserwuje się w biurowej podstrefie Centrum-Zachód, która położona jest w okolicy Ronda Daszyńskiego. Tam buduje się niemal 70% nowo powstałej powierzchni biurowej w Warszawie.

W 3 kwartale 2023 roku wskaźnik pustostanów na warszawskim rynku biurowym obniżył się o 0,8 p.p. względem poprzedniego kwartału, do wartości 10,6%. Najmniejsza dostępność powierzchni biurowej występuje w strefie centralnej. Tu wskaźnik pustostanów wyniósł 9,1%, podczas gdy w strefach pozacentralnych kształtował się na poziomie 11,8%. Najwyższy wskaźnik wolnej powierzchni odnotowano na Służewcu, najniższy w podstrefie Centrum-Północ.

Biura Warszawa miasto dane ekonomiczne 3 kwartał 2023
more offers
more offers
more offers

The most searched phrases